Sealed bids for construction of the City of Berlin Infiltration and Inflow Reduction Project Phase 2, Contract 1 will be received at Berlin City Hall by the Office of the Director of Public Works, at 168 Main Street, Berlin NH 03570 until 2:00 PM local time, March 17th, 2021. The project generally involves the reduction of infiltration and inflow (I/I) to the sanitary sewer system via replacement of gravity sewer pipe, installation of storm drain infrastructure, and removal of illicit sewer connections on private property that discharge to the sewer. A non-mandatory pre-bid teleconference will be held at 10:00 AM on March 2nd, 2021. A link to the teleconference will be sent to registered planholders. For more information, please contact Project Engineer Matthew Burns, PE at 207-761-2991. The plans and specifications can be viewed at www.wright-pierce.com/projects.aspx.